Model Number: | C0911 |
---|---|
Brand Name: | WJ |
Place of Origin: | China (Mainland) |
Quick Details
Specifications
1, the entire production line layout length of 20-30 meters, width of 3 meters (about 60-100 square meters).
2, the host part of the steel structure, stainless steel panel, side panel with paint.
3, the Longmen working dimensions of the required processing.
4, hydraulic station, using the latest technology pump for multiple pump sources (to ensure speed stable). Hydraulic parts using laminated clip (ease of maintenance), and tensile force and clamping force of stepless adjustment of traction speed precision throttle valve is used, relief valve to ensure traction speed stability, and traction speed stepless adjustment. Hydraulic station is equipped with powerful cooler, easy to operate 24 hours a day, to ensure the normal operation of the hydraulic system.
5, the use of functions: with a single, dragon door manual operation and double automatic reciprocating operation. Automatic intermittent time can be set automatically.
6, the mold temperature control adopts intelligent high precision six zone temperature control, each area can be controlled separately, realize the automatic control of the mold heating temperature.
For large section drawing and extrusion profile design, the traction force is strong, the operation is stable and reliable
Setting the debugging, continuous two kinds of traction, to facilitate the production process adjustment
Excellent dual hydraulic system, strong anti-interference ability of the system
Equipped with a powerful cooler, easy to achieve 24 hours of operation
Main electric, hydraulic components adopt international famous brand, high sensitivity, low failure rate. Fault early warning function.