After-sales Service Provided: | Engineers available to service machinery overseas |
---|---|
Warranty: | 1 year |
Brand Name: | Singring |
Place of Origin: | China (Mainland) |
Coating: | Galvanizing |
Substrate: | Iron |
Type: | Coating Production Line |
Condition: | New |
Quick Details
Specifications
Automatic Controlled Equipment for Steel Wire Hot Dip Galvanizing Production Line
1. Company location: Wuxi city;FOB port: Shanghai
2. ISO9001:2008 and CE certified
3. Participate actively in international competition
4. Experience: more than 20 years
5. Professional technology discussion and warm customer service
Main production process: Pay-off -->Hot water washing-->Alkali washing--> Hot water washing-->Fume-free (HCl) pickling bath-->2-step water washing-->Flux bath-->Drying-->Hot-dip galvanizing bath-->Take-up
Specifications:
? Usegas heating(inside, outside or surface) or electricity inside heating method. Uniform Zinc temperature, accurate control, high production efficiency and good product quality.
? For gas inside heating, nozzle with one-end immersed provides heat, air self exchanges heat with high efficiency, to achieve high heating efficiency, can maximum reduce zinc oxidation and burning loss.
? Nitrogen wiping system,suitable for middle or high wire running speed. Through adjusting the Nitrogen flow,pressure and wire running speed can precisely control the zinc thickness
? Zinc bath material: Metal or ceramic bath,high heating efficiency, anti-zinc corrosion, little zinc slag and achieve long lifetime of bath
? Heat-resistant ceramic pressing roller in zinc bath, gets the advantages of heat-resistant, wearing-resistant, no zinc slag reaction and long lifetime.
? For Gas and electrical control, we use international famous brand, control system is safe and reliable. Humanized design and safe function design, to achieve convenient site operation and maintenance.
? Can reach high DV
? Low ordinary maintenance cost
? Suitable for Steel wiregalvanizing and Zn-Al galvanizing.
Our Services
? Turnkey project
? Whole plant or workshop arrangement advise
? Machines installation and commissioning
?Train the worker how to operate the production line,and technoly and process trainging
? Documents include: Foundation drawings, machine drawings, electrical drawings; Machine list, spare parts list; Machine operating manual(with pictures), detailed traing manual. (the above would be booked as a delivery book, electric edition available)