After-sales Service Provided: | Engineers available to service machinery overseas |
---|---|
Warranty: | 12 months |
Certification: | ISO |
Weight: | 3500KG |
Dimension(L*W*H): | 3.2*1.4*1.9M |
Power(W): | 3.5KW |
Voltage: | 380V |
Model Number: | PFK-787 |
Brand Name: | Perfect |
Place of Origin: | China (Mainland) |
Processing Type: | Pulp Molding Machine |
Product Type: | Toilet Tissue |
Condition: | New |
mini: | tissue paper making machine |
Quick Details
Specifications
A: Brief Introduction of our waste paper recycling small tissue paper making machine
The whole production line consists of below four parts:
1. Waste paper boiler system
2. Paper pulp making system
3. Tissue paper making machine
4. Valves, pipelines, cables and electrical control cabinets
B: Technical parameters of our small toilet paper making machine
Raw material: waste paper, pure wood pulp
Output tissue: medium and high grade tissue paper
Width of tissue paper: 787mm
Width of net cage: 800mm
Output weight: 14-40g/m 2 ;
Capacity: 1.0 T/D
Rail gauge: 1300mm
Drive way: speed reducer drive
C. Consumption details
1. 1.1 ton wooden pulp plate can produce 1ton toilet paper
2. Water: 30m3 per ton toilet paper
3. Electric: 500-600 kilowatt-hour meter / 1ton toilet paper
4. Steam: 4 ton steam /1ton toilet paper
D. Payment and delivery of our toilet tissue making machine
1. 40% prepayment by T/T,then pay a 10% monthly progress payment, rest should be payed off before delivery.
2. Delivery time is within 3 months after prepayment, exporting standard packing.
3. Warranty is 12 months( wearing parts are not included), within the warranty period, replacement of the fitting parts are free of charge.
E. Installation and Training of our tissue paper making machine
1. Tissue paper making machine foundation drawing, which required the construction area according to the client side , terrain, topography, and soil material to determine , usually within one month after signing the contract.
2. The salary of our engineers is USD2500 per person, and need 2-3 engineers to help you install and training, the salary will be payed earlier and the staying time depends on the buyers workers quality; The buyer should guarantee the safety of our engineers and account for the cost of the round flight tickets and accommodation of our engineers;Buyer should provide translator who can speak Chinese.
F. Breach of contract and claims
According to the contract agreement, the defaulting party should make compensation which is equal to the exporting contract value
The whole production line consists of below four parts:
1. Waste paper boiler system
2. Paper pulp making system
3. Tissue paper making machine
4. Valves, pipelines, cables and electrical control cabinets
B: Technical parameters of our small toilet paper making machine
Raw material: waste paper, pure wood pulp
Output tissue: medium and high grade tissue paper
Width of tissue paper: 787mm
Width of net cage: 800mm
Output weight: 14-40g/m 2 ;
Capacity: 1.0 T/D
Rail gauge: 1300mm
Drive way: speed reducer drive
C. Consumption details
1. 1.1 ton wooden pulp plate can produce 1ton toilet paper
2. Water: 30m3 per ton toilet paper
3. Electric: 500-600 kilowatt-hour meter / 1ton toilet paper
4. Steam: 4 ton steam /1ton toilet paper
D. Payment and delivery of our toilet tissue making machine
1. 40% prepayment by T/T,then pay a 10% monthly progress payment, rest should be payed off before delivery.
2. Delivery time is within 3 months after prepayment, exporting standard packing.
3. Warranty is 12 months( wearing parts are not included), within the warranty period, replacement of the fitting parts are free of charge.
E. Installation and Training of our tissue paper making machine
1. Tissue paper making machine foundation drawing, which required the construction area according to the client side , terrain, topography, and soil material to determine , usually within one month after signing the contract.
2. The salary of our engineers is USD2500 per person, and need 2-3 engineers to help you install and training, the salary will be payed earlier and the staying time depends on the buyers workers quality; The buyer should guarantee the safety of our engineers and account for the cost of the round flight tickets and accommodation of our engineers;Buyer should provide translator who can speak Chinese.
F. Breach of contract and claims
According to the contract agreement, the defaulting party should make compensation which is equal to the exporting contract value