Use: | Well Drilling |
---|---|
Material: | AISI4145H |
Type: | drilling tools |
Model Number: | all codes |
Brand Name: | GREAT |
Place of Origin: | China (Mainland) |
Color: | golden |
Size: | 3"-26" |
Size of pdc cutter: | 13mm/16mm/19mm |
Code: | all codes |
Market: | all the world |
Application: | oil and water well |
Certification: | api |
Quick Details
Specifications
steel body pdc drill bit 5 blade drill bit for well drilling tools
matrix body
"matrix" is a very hard,rather brittle composite material comprising tungsten carbide grains
metallurgically bonded with a softer,tougher,metallic binder.matrix is desirable as a bit material,
because its hardness is resistant to abrasion and erosion.It is capable of withstanding relatively
high compressive loads,but,compared with steel,has low resistance to impact loading.
steel body
"steel" is metallurgically opposite of matrix,It is capable of withstanding high impact loads,
but is relatively soft, and without protective features would quickly fail by abrasion and erosion.
quality steels are essentially homogeneous with structural limits that raely surprise their users.
We had very good relationship with the PDC Cutter factory in the world ,Like USS ,E6,Smith ;
And discuss the cutter technology and long term cooperation and relationship. So that we can
improve our PDC drill bits performance , drilling faster and lower cost.
GREAT attends to the exhibition all over the world :
CHINA : CIPPE(Beijing China) 19th-21th March ; CIOOE(Shanghai China) 26th-28th Augest ;
CKPPE(Xinjiang , The oil city of China) 5th-7th September;
Unites States : OTC(Houston,USA ) 4th-7th May Every Year ( Reliant Arena No.6117 )
Russia : Moscow Oil and Gas Exhibition 23th-26th June
Indonesia :Jakarta Oil and Gas Exhibition 13th-15th November
India : New Delhi Oil and Gas Exhibition 12th-15th January
Iran:Teheran Oil and Gas Exhibition 5th-8th May
Abu Dhabi :The Abu Dhabi International Petroleum Exhibition and Conference 9th-12th November.
Our Produce Team
Our Inner Factory
Great New Factory(building)
PACKAGING:
1.Cartons: light weight of the goods.
2.Wooden box, iron box: heavy weight of the goods.
SHIPPING:
1.by air: fast speed, general 3~5 days, but the number of goods less, high cost of transportation.
2.by land: speed is generally, 10~15 days, the number of goods large. general cost of transportation.
3.by sea: speed is slowly, 20~30 days, the number of goods large. cheep cost of transportation.
4.by express: by DHL, by FedEx, by TNT, etc.
Drilling Requirement Initially ,Customer Satisfaction Finally
We will keep track of each customer to get the feedback of product quality and service.
And we will make an amendment according to your feedback.Please feel free to contact
us if you found any problems.
1.24 hour uninterrupted service, answer your questions in a timely manner.
2.Warm welcome guests to visit.
3.One of the largest manufacturer and supplier in Asia. High technology, high quality.
4.Flexible production.
5.Sincerely cooperate with you.
6.Service to customer satisfaction.