Product Main

Quick Details

Model Number: 3
Brand Name: Sheen
Place of Origin: China (Mainland)
nitriding treatment: alloy material

Specifications

Bimetallic screw and barrel

Specification:

Screw diameter:Φ15mm-Φ360mm     Screw max length:8000mm

Barrel diameter:Φ15mm-Φ360mm       Barrel max length:7000mm

Bimetallic alloy material:

1.Ni-based alloy   

2.Fe-based alloy

3.Co-based alloy  

4.Nico-based alloy

5.Tungsten carbige

Bimetallic screw barrel processing method:

Plasma Alloy Coating Spraying or Wc/Co Whole spray welding

Bimetallic Barrel production method:Centrifugal Casting (Inlay Alloy)

Outstanding Features of Bimetallic Screw and Barrel:

       

1)Hardness HRC50-65    

2)Outstanding corrosion-resistance.

3)Hardness layer reaches 1.5 m/m thickness.Hardness does not decrease with depth.

4)Hardness does not decrease under normal temperature.

5)Abrsion resistance / wear resistance on the hardened layer is 2~3 times higher than that treated by conventional heat treatment.

Screw barrel Material

Material

Heat treatment

38CrMoALA,SACM645,42CrMo,DIN1.8550,SAE8550

Nitrided treatment

42CrMo, AISI4140

Hard-chrome plating

Cr12Mov,SKD11,SKD61,

High Frequency quenching

4Cr5MoSiV1,SKD-11,SKD-61

Bimetallic frist,then nitrided

YPT72, 4Cr5MoSiV1

HVOF

GH113

Temepture:300-1400

Bimetallic material and production method way

Bimetallic material: Tungsten carbige 40%

Bimetallic screw production method is PTA.

We spray tungsten carbige 40% on the surface of screw flight.The thickness of bimetallic layer is 2.5mm  The hardness of bimetallic layer is HRC58-72.

Another one way is Fully coated bimetallic layer.  

 

 

Bimetallic barrel production method is centrifugal casting. The Thickness of bimetallic layer is single side 5mm on the barrel inner wall.

Another two way is groove bimetallic layer and SKD Bimetallic inner case.

The difference between these three ways:

1.The SKD  is harder than bimtallic. 

2.The centrifugal casting bimtal will be many small pores in the bimetallic layer,not stable enough.

3.The SKD is brought from professional steel company with quality guarantee,

4.The service life of SKD case will more half than the centrifugal casting bimrtalic barrel,but the price will be similar.

Below pictures will show you clearly



Base material 38CrMoALA chemical composition and main feture

This kind of material is made in China from SHANGHAI BAOSTEEL COMPANY.

C

Si

Mn

S

P

Cr

Al

Ni

Cu

Mo

0.35-0.42

0.20-0.45

0.30-0.60

<0.035

<0.035

 1.35-1.65

 0.70-1.10

 <0.030

 <0.030

 0.15-0.25

Screw barrel technical details

Bimetallic Alloy Materials

1)Fe-based alloy   2)Ni-based alloy/Deloro alloy  

3)Co-based alloy  4)NiCo-based alloy   

5)Tungsten carbide/Wolfram carbide 

Double-alloy level

Level A - containing Tungsten of 40%   

Level B - containing tungsten of 25%  

Level C - containing tungsten of 9.5%

Surface Treatment

Heat Treatment

High Frequency Treatment

Nitriding treatment(120 Hours)

Depth of Nitrided Layer: 0.5-0.8 mm                             

Hardness of Nitrided Layer: 900-1020Hv (HRC56°-65°)

Hard Chrome Plating treatment:

Thickness of Hard Chrome Plating Layer: 0.05-0.10mm             

Hardness of Hard Chrome Plating Layer: ≥950HV

Nickel alloy plating.treatment:

Bimetallic Barrel/Cylinder: Centrifugal Casting (Inlay Alloy)     

Bimetallic Screw: Plasma Alloy Coating Spraying

Depth of Bimetallic Layer: >2mm                                 

Hardness of Bimetallic Layer: HRC55°-72°

Basic information

Roughness of the surface:Ra0.4um                            

Linearity of the screw: ≤0.015mm

Linear axis limit: ≤0.02mm                                    

Hardness after Hardening & Tempering: HB240-280

Fragility of Nitration:≤Two class

Material Application

1)General Plastics                                

2)ABS,PA,PC,PE,PET,PP,PS,EVA,PU,PVC,U-PVC,etc

3)PA + GF(Glass Fiber)                        

4)Flame-resistant Reinforced Plastics

5)Modified Engineering Plastics             

6)All kinds of Mixed Recycled Material(in Scrap or Granule),etc

General Terms

Means of transport: Ocean,Air,Express

Production time: About 25 days after we receive the deposit and lead time will different according to the order quantity!

Our screw and barrel processing flow

Customer order----Product design(customer drawing)---Production flow arrangement----Material Procurement---Hardening and tempering--

--Drilling---Rough turning---Rough thread rolling(Alloy spray welding)---alignment---Fine thread rolling---Mixing---Alignment---High frequency treatment---Alignment---Polishing---Grinding----120 hours Nittriding treatment---Acid piclking----Polishing---Chrome plating----O.D.Grinding---Packaging and Shipping.

Package details

1st, products (screws or barrels) will be brushed anti-corrosive oil    

2nd,packed with film,brush oil

3rd,packed in the wooden case