Product Main

Quick Details

Processing: Fermenting Equipment

Specifications

Product instruction for your reference:

Beer Brewery Machine system Overview

(Can be customized )

 

Architecture

Main Components

Trituration System

Malt Mill

Brwehouse

Mash Tun, lauter tun, kettle, whirlpool

Fermentation unit

Fermentation tank

Brite tank

Cooling unit

Ice liquor tank

Chiller 

Cleaning unit

Acid tank

ALKALI tank

Sterilize water tank

Control unit

Touch screen

Control cabinet

CE certified electric fittings

Speed control

Temp display and control

 

Packaging & Delivery

1.LCL/FCL(20GP/40GP/40HQ)

2.Packed with plastic film in fumigation free wooden case or fixed with iron frame

3.Up to export standard, suitable for delivery

4.Customer's requirements available

5.Terms of payment: 50% T/T deposit, 50% T/T.

6.Time of shipment:30 days since receipt of payment.

 

 Installation instruction:

1. Electrical parts fit the local power requirement.

Yucheng Zeyu Machinery Co, Ltd.

2.Since it is a little noisy during working, it is better to install the chiller outside.

3. Better to install the mill in a separate milling room.

4. If necessary, there will be a steam condenser assorted with brew house, to avoid

the steam problem in the room.

5.If customer needs, we can appoint our engineer for the installation. Installation

time: 30 days, for 1 engineers. The work including equipment installation, training and brewing the first batch of beer.

6. Customer affords the air tickets cost, insurance, food and accommodation.