Processing: | Fermenting Equipment |
---|---|
After-sales Service Provided: | Engineers available to service machinery overseas |
Warranty: | 1 year |
Certification: | CE, ISO |
Processing: | beer brewing equipment |
Weight: | 300KG |
Dimension(L*W*H): | Depends on capacity |
Power(W): | 5-20kw |
Voltage: | 220-400v |
Processing Types: | Alcohol |
Brand Name: | zeyu |
Place of Origin: | China (Mainland) |
Condition: | New |
Quick Details
Specifications
Product instruction for your reference:
Beer Brewery Machine system Overview (Can be customized )
|
|
Architecture |
Main Components |
Trituration System |
Malt Mill |
Brwehouse |
Mash Tun, lauter tun, kettle, whirlpool |
Fermentation unit |
Fermentation tank |
Brite tank |
|
Cooling unit |
Ice liquor tank |
Chiller |
|
Cleaning unit |
Acid tank |
ALKALI tank |
|
Sterilize water tank |
|
Control unit |
Touch screen |
Control cabinet |
|
CE certified electric fittings |
|
Speed control |
|
Temp display and control |
Packaging & Delivery
1.LCL/FCL(20GP/40GP/40HQ)
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame
3.Up to export standard, suitable for delivery
4.Customer's requirements available
5.Terms of payment: 50% T/T deposit, 50% T/T.
6.Time of shipment:30 days since receipt of payment.
Installation instruction:
1. Electrical parts fit the local power requirement.
Yucheng Zeyu Machinery Co, Ltd.
2.Since it is a little noisy during working, it is better to install the chiller outside.
3. Better to install the mill in a separate milling room.
4. If necessary, there will be a steam condenser assorted with brew house, to avoid
the steam problem in the room.
5.If customer needs, we can appoint our engineer for the installation. Installation
time: 30 days, for 1 engineers. The work including equipment installation, training and brewing the first batch of beer.
6. Customer affords the air tickets cost, insurance, food and accommodation.