| After-sales Service Provided: | Engineers available to service machinery overseas |
|---|---|
| Certification: | iso ce |
| Weight: | 5~50ton |
| Dimension(L*W*H): | Depends |
| Output: | Hot Water |
| Model Number: | cwns |
| Brand Name: | zhongding boiler |
| Place of Origin: | China (Mainland) |
| Fuel: | Gas-fired |
| Style: | Horizontal |
| Pressure: | Low Pressure |
| Structure: | Fire Tube |
| Usage: | Industrial |
| Type: | Natural Circulation |
| Condition: | New |
| Capacity: | 0.5-20t/h |
| Rated working pressure: | 0.7 |
| supply water temperature: | 95 degree |
| Thermal efficiency: | 92.4%--94.5% |
| water content: | depends |
| Design fuel: | Lng |
Quick Details
Specifications
Product Description:
This series boiler is horizontal three pass fire tube hot water boiler.It equipped with good performance burner and advanced techniques.The burning control, water feed,programs run,etc,are full automatic.This boiler is safe and reliable, and also has the advantage of compact structure,simple operation,easy installation, high efficiency ,less pollutionand noise,etc.It is widely used for factory, hotel, hospital, office building, etc.

1.Monitoring of water level: Equipped with water level electronic detector to control the water level.
2.Setting time: The users can set the starting and stopping time as their demand.
3.Electric leakage protection: When the elements of boiler have a electric leakage, the control system will cut off power automatically.
4.Water shorage protection: When the boiler is lack of water, the system will turn off burner and raise alarm.
5.Over pressure protection:When the pressure of boiler is over your setting point, burner will stop working and raise alarm.
6.Power abnormal protection:When the power ia abnormal, the boiler will stop working immediately.

Company Information:

Warranty and after-sale service
Top quality of every set of machine and best after-sales service as followings :
(A) The boiler body guarantee is two years , for accessories three years.
(B) During the guarantee period , if the main body defective or broken without wrong operating , Zhongding must replace the parts for free or prepare the spare-parts for free.
(C) Zhongding should provide boiler technical service and operation guidance for whole life long.
(D) Regarding to the installation and training , the buyer should take all the correlative charges (accommodation and food , round -trip tickets).

