After-sales Service Provided: | Engineers available to service machinery overseas |
---|---|
Certification: | ISO CE |
Weight: | 5~50ton |
Dimension(L*W*H): | Depends |
Output: | Steam |
Model Number: | szl |
Brand Name: | zhongding boiler |
Place of Origin: | China (Mainland) |
Fuel: | Coal-fired |
Style: | Horizontal |
Pressure: | High Pressure |
Structure: | Water Tube |
Usage: | Industrial |
Type: | Natural Circulation |
Condition: | New |
Capacity: | 1-20t/h |
Rated working pressure: | 1.6Mpa Optional |
Thermal efficiency: | 92.4%--94.5% |
Heating Area: | 44.9 -735 |
Steam Temperature: | 170-225 Degree Celsius |
water supply temperature: | 20 degree |
Quick Details
Specifications
This series boiler is single drum three-return water tube and fire tube steam boiler.Both sides of the wall around the furnace are radiation heating surface .the lateral of boiler body is shell of the three-dimensional shape
The boiler uses the vaulted tube plate ,spiral gas tube to make the thermal efficiency higher and output capacity suffcient .
1. This series boiler is horizontal three-return fire tube and water tube mixed hot water boiler. There is a bundle of spiral gas tube in the boiler drum. And the furnace of the boiler has water wall tubes at the both side.
2. The fire grate is light weight and blocky. Equipped with Induced draft fan and forced draft fan to make good ventilation.
3. Fuel fell on grate was burned, the flame through the combustion chamber ,the economizer and was drew forth by induced draft fan and into the atmosphere.
Company Information:
Warranty and after-sale service
Top quality of every set of machine and best after-sales service as followings :
(A) The boiler body guarantee is two years , for accessories three years.
(B) During the guarantee period , if the main body defective or broken without wrong operating , Zhongding must replace the parts for free or prepare the spare-parts for free.
(C)Zhongding should provide boiler technical service and operation guidance for whole life long.
(D) Regarding to the installation and training , the buyer should take all the correlative charges (accommodation and food , round -trip tickets).