| Toilet Seat Type: | Closed Front |
|---|---|
| Toilet Seat Shape: | Round |
| Toilet Seat Material: | UF/duroplast/urea |
| Feature: | Slow-Close Toilet Seats |
| Model Number: | F023S+Z03U |
| Brand Name: | OEM/ODM |
| Place of Origin: | China (Mainland) |
| Hinge material: | Zinc alloy |
| Hinge function: | Adjustable top fixing hinge |
| Net weight: | 2.6kg |
| Style: | Wrapover |
Quick Details
Specifications
Product Name: toilet seat cover
Model No.: F023
Material: duroplast
Hinge: adjustable zinc alloy hinge
Function: soft close
MOQ: 500sets per model
Feature:
1) Imported UF material from Europe, antibacterial optional
2) Resistant to scratch and cigarette burn
3) High gloss surface
4) with our latest one- push button barrel hinge, durable and simple to intall.
5) Product and components are designed by Oceanwell without any patent problem.
6) Fully adjustable to fit maximum toilets
7) We can also produce items according to your requirements.
Installation:
Company Information:
FAQ:
Q1: What is your product MOQ?
A: Our MOQ for urea toilet seats is 500 sets per item, for PP toilet seat is 1000 sets per item, for cisterns is 300~ 500 sets per item.
Q2: What is your port?
A: Xiamen, China
Q3: Can we have our logo on your products?
A: Yes, we welcome OEM/ODM projects. We can not only work as your OEM factory, but also work with you together on developing new projects or products.
Q4: Do you test your products per production?
A: of course, we have our own professional lab in the factory for the tests of toilet seat, concealed cistern.
E.g. for the toilet seats, we have slam test, rocker test, static loading endurance test, dymatic pressure endurance test, force life test for soft close damper, comprehensive lifecycle test, etc.
Q5: What's the payment terms?
A: Generally, we accept T/T, L/C.
Q6: What the lead time for your production?
A: Normally, for toilet seat, the lead time will be around 35-40 days for the first order, and 30-35 days for the following orders; for flushing cisterns, the lead time will be around 40-45 days.

