Type: | Door & Window Grates |
---|---|
Material: | Wrought Iron |
Brand Name: | JDL |
Type: | JDL-1011 |
materials: | Wrought Iron |
Model Number: | JDL-1011 |
Place of Origin: | China (Mainland) |
Glass: | Frosted |
Lock: | Single Bore Lock |
Jamb: | 2" * 6" |
Mounting: | Tabs |
Handles: | Q |
Quick Details
Specifications
Product Description
Product Description
1. Iron door info
- Item:Eyebrow Arch Wrought Iron Double Entry Doors for House(JDL-1011)
- Material: Wrought Iron
- Style: Double door/ arch/round/half circle top
- Size: 6*8ft/customized
- Anti-Rust:sand blast, hot zinc spray, epoxy primer(twice), acrylic acid black paint, hand applied faux finish, varnish coat
- Threshold:Intergrated threshold with door jamb to ensure the strongness of the iron door
- Weather Stripping:Rubber weather stripping seals around jamb,door panel and glass panel
- Polyurethane foam:Jamb,panel,threshold and kickplate are fully injected with polyurethane foam
2. Material parameters (can be customized)
- Jamb&Door Panel:2"x6" with 14 guage tube
- Scroll Work: 5/8" solid steel
- Glass:5/8" dual paned tempered glass
- Lock Holes:2-3/8" backset,2-1/8" diameter,5-1/2" center to center
3. Manufacture procedure
- CAD drawing
- Prepareing Materials
- Assembling
- Welding
- Polishing
- Sanding Blast&Zinc Spraying
- Adjusting
- Epoxy slurry to fill minor imperfection
- Epoxy primer first time
- Epoxy primer second time
- Acrylic acid black paint
- Hand applied faux finish
- Varnish coat
4.Finish Option
- Dark Copper
- Mediumn Copper
- Light Copper
- Mediumn Sponged
- Gold Rush
- Silver Pewter
- Warm Gold
5.Glass Option
- Clear Glass
- Rain Glass
- Aquatex Glass
- Water Glass
- Water Cubic Glass
- Pebble Glass
- Frosted Glass
- Reeded Glass
6.Packing
- Door panel:packed with EPE, bubble wrap,corrugated paper, polywood case. Glass fragile and this side up on the crate for the convenience of discharge at your side.
- Door frame: packed with EPE and bubble wrap.
- FCL: the crate will be put in rows and the frame will be put above the crates.
- LCL: the crates and frame will be put into two iron stands for the safety of shipping and the convenience of discharge.
7.Leading Time
- Lead time 1-5 sets: about 25 days
- 1 20ft container: about 30 days.
- 2-3 containers: about 40 days.
- Delivery clause FOB Xiamen
8.Payment Term
- Terms of payment Orders $5000 or under: full payment is expected when order is approved.
- Orders over $5000: 50% as deposit, balance against copy of B/L.
- We accept T/T and L/C for the payme