Product Main

Quick Details

Type: Scaffolding Parts
Scaffolding Part Type: Scaffolding Frames
Brand Name: Baoshi
Scaffolding Part Type: Frame Scaffolding
Size: Length 914/1219/1524/1700/1930mm
Material: Q235 steel pipe
Model Number: BS17015
Place of Origin: China (Mainland)
Surface treatment: HDG, powder coated, Galvanized ,Dip painted.
Color: Silver, Orange, Red, Blue or as your requirements
Tube Thickness: 2.0/4.0mm
Width: 914/1219/1524mm
Certification: SGS
Technique: CO2 Arc Welding
Payment: T/T in advance, L/C at sight
Usage: Mobile Frame Scaffold for Construction
Framework: Frame Combined Scaffolding
Move Method: Horizontal mobile Scaffolding

Specifications

Product Description

1. Component

A Set of frame scaffolding system  has 2 Pieces of welded main frames,4 pieces of connecting pins and 2 pairs of cross Braces. the 1219mm width *1700mm height walk-thru frame is one of the most Common and widely used systems in Malaysia.

2.Advantages

L  Solid & stable structure Offers safety & reliability.

L  Simple assembly that is Easy to dismantle by hand, easy to carry and convenient to transport to Different locations.

L  Highly efficient set-up Helps optimize manpower and recourse.

L  Painted or galvanized Coating are available.

3. Surface finish

H type frame Scaffolding for construction are dip painted which means that the inside of the Frame scaffolding tube can be painted to against anti-rustiness.

4.Applications

Construction Frame Scaffolding is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

Product Specification

Name

Code

Height(mm)

Width(mm)

Thickness(mm)

KG

KMFG-1219

1930

1219

2/2.2

20.4

KMFG-1217

1700

1219

2/2.2

15.5

KMFG-1217

1700

1219

2/2.2

14.3

KMFG-1215

1524

1219

2/2.2

16.7

KMFG-0917

1700

914

2/2.2

13.7

Material

Q235  steel pipe

Surface treatment

Hot dip galvanized(HDG), powder coated, Galvanized,Dip Painted.

Color

Red, Blue, Silver, Grey, Etc

Welding technique

CO2 arc Welding

Certification

SGS

MOQ

25Tons

Payment

T/T in advance, L/C at sight

Delivery time

25-35days after deposit

Package

Steel standard pallet or as your request

Production capacity

5000 Tons/year

 Package and Shipment

Walk through Frame Scaffolding System


Application

Walk through Frame Scaffolding System


Why choose us?

We believe that long-term customer relationships are build by 3 factors:
 
Our pricing

most, if not all, of our items are directly imported from manufacturers all over the world.
Therefore we have the ability to give you competitive prices.

Our services

" We believe in service!"  is our company motto and we live by it. Our friendly, fast, efficient and reliable sales personnel are always available to take your orders and assist you and meet your requirements.

Our inventory

10 years of close and persistent partnership with domestic leading factories enable us to keep stocks of our items in sizeable quantities any time ready to ensure on the time concept in our delivery and commitment with maximum to ensure no delays.

FAQ:
1. Q:What's your MOQ?
A:25MT, it is for one container.
2. Q:Do you provide samples? Is it free or extra?
A:Yes, we could offer the sample for free charge.
3. Q:What's your normal delivery time?
A:Our delivery time about 20-30days for standard sizes, if you have Other requirements like hardness, quanity and width,it is about 25-40days. 
4. Q:Are the products tested before shipping?
A:Yes, all of our products was inspection before shipping. the third Party inspection is also acceptable(SGS, BV, COC, etc.)

Contact Us 
Walk through Frame Scaffolding System