Usage: | Portable generator |
---|---|
Power: | Electronic |
Brand Name: | GOLD |
Warranty: | 1 years |
weight: | 50kg |
Model Number: | GD-SLQ |
Place of Origin: | China (Mainland) |
Quick Details
Specifications
Besides the trip test of the complete loop to determine the integrity of the whole secondary protection circuit, other typical primary injection testing applications are:
L Checking that the MV/HV/LV circuit breakers trip in response to an overcurrent.
L Checking of CT/VT/PT ratios and polarities, to determine that the relationship between primary current and secondary current seen by the relay is correct.
L Checking the correct wiring of the protection system, and that all protective devices are properly connected.
L Checking of overcurrent and earth fault relays through primary injection testing.
L Checking of CT circuits, to verify that all switches and protective relays receive the proper current at the proper angle as expected.
L Testing of reclosers and sectionalizers.
L Thermal tests on busbars, switchgear and electrical panels.
L Testing ground grid installations.
Introduction
---Continuous Running Primary Current Injector Tester 5000A Transformer Injector Testing Equipment
SLQ is an essential equipment used for electrical debugging to generate high current, which be widely used in power plants, power distribution stations, electrical plants, scientific research, laboratories and other units.
It is a short-term or intermittent work device and characterized by small size, light weight, good performance, easy use and maintenance.
SLQ Features
---Continuous Running Primary Current Injector Tester 5000A Transformer Injector Testing Equipment
L Two ammeters, can supervise different measurement range.
L with indicator lighting and button, easy to operate
L Incorporated and dividable structure, easy to move.
L the equipment capacity is designed based on 5-minute short-term work system. for intermittent work, working time should be less than 2.5 minutes, before continuing to work it should be shut down for 10 minutes so that all parts of the machine can cool down.
SLQ Specifications
---Continuous Running Primary Current Injector Tester 5000A Transformer Injector Testing Equipment