Product Main

Quick Details

Weight: 3kg
Brand Name: Bioevopeak
Display Type: Digital thermometer
Measuring Range: 1.3000-1.7000(nD)
Accuracy Class: 0.0002(Estimate Reading)
Brix Range: 0-95%
Measurement Accuracy: 0.0002
Size: 270mmx180mmx370mm
Model Number: RFT-A1

Specifications

Bioevopeak Laboratory RFT-A1 ABBE Refractometer

Characteristics

  • Measurement of refractive index nD, average dispersion nF-nc of transparent or translucent liquid and solid substances
  • Measurement of mass fraction (Brix) of cane sugar solution
  • Widely Used in the field of sugar, pharmaceutical, beverage, petroleum, food, Chemical industries as well as research institutes and educational Department
  • Visual aim, optical index-plate reading
  • Easy and reliable
Specifications

Parameters/Model

RFT-A1

Refractive index nD

1.3000-1.7000

Accuracy(nD)

± 0.0002 (Estimate Reading)

Dissolved Solids Brix

0-95%

Temperature display

Digital thermometer

Observation mode

Monocular

Weight (Gross)

3 kg

Overall Dimensions

270mmx180mmx370mm




CERTIFICATE

Bioevopeak Laboratory RFTA1 ABBE Refractometer



FAQ

Q: how about quality of the goods?

A:

All the running products comply with CE standards.

Independent Quality inspection team, conducting multiple inspections and random Inspections from parts supply to product dispatch.

Well-known third-party testing service available, such as SGS, BV, and TUV, etc.

 

Q: What are your pre- and after-sales services?

A:

Timely reply to pre-sales enquiries

Real-time update of manufacturing and shipment status

Contracted third-party maintenance company in over 60 countries

Assured availability of parts supply for 10 years at least

 

Q: Is OEM service available.

A: most of the running products are available for OEM customization, Including logo, package and function, if attainable, customization.

 

Q: how long is the lead time:

A: Generally, the lead time for most stocked products is about 7~15 days, Vary by models and production schedule. for those non-stocked products, the manufacturing lead time is around 20 days.