| Brand Name: | Bioevopeak |
|---|---|
| Condition: | / |
| Feature: | Magnifier:3x |
| Certificate: | CE; ISO 9001 |
| brand: | Bioevopeak |
| Model Number: | POL-DISC4 |
| Place of Origin: | China (Mainland) |
| Light Source: | Sodium lamp |
| Optical Wavelength: | 589nm |
| Sample Tube Length: | Up to 200mm |
Quick Details
Specifications
Features
the instrumentsis equipped with a 589nm sodium lamp. Switch on the Power,the polarized light beam radiatesto the polarizer filter. the Operator is able to observe the distinctvisual fields
through eyepiece. Put the glasssample tube into the measurement Chamber, rotate the vernier knob until the visual fields appear the Equal brightness. Read and record the measured values from
the vernier scale, the measurement is completed.
Ordering Information
POL-DISC4: Polarimeter, glass sample tubes (100/200mm) and sealing rings.
Specifications
Model |
POL-DISC4 |
Range |
±180° |
Scale Value |
1° |
Vernier |
0.05° |
Magnifier |
3x |
Light Source |
Sodium lamp |
Optical Wavelength |
589nm |
Sample Tube Length |
up to 200mm |
Power Requirements |
AC 220V/50Hz |
Dimensions |
500(L) 135 (W)330(H)mm |
Weight |
5kg |
Q: how about quality of the goods?
A:
L All the running products comply with CE standards.
L Independent Quality inspection team, conducting multiple inspections and random Inspections from parts supply to product dispatch.
L Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
L Timely reply to pre-sales enquiries
L Real-time update of manufacturing and shipment status
L Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: most of the running products are available for OEM customization, Including logo, package and function, if attainable, customization.
Q: how long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, Vary by models and production schedule. for those non-stocked products, the manufacturing lead time is around 20 days.

