for the supply and sewerage use of river water,well water etc,such as farm field aquiculture and poultry ,graden,hotel,mess hall and high-rise building and so on. the source water should be rinsing,ph6-8 for the first time operation,the cistern should be filled of water,electrified for scores of seconds,the water can be supplied ,it is unnecessary to fill the cistern with water afterwards.