Commodity: Manganese Ore
Quantity:600,000MT/year (300,000MT Lump Ore + 300,000MT Sinter Feed Ore)
Delivery:12 X 50,000MT (25,000MT Lump Ore + 25,000MT Sinter Feed Ore)
First shipment: No later than 3/31/2006
Variations per shipment: +/- 10% per shipment
Destination port: The above mentioned tonnages shall be discharged at main ports to be nominated by the BUYER, no later than 30 (thirty) days before shipments.
Price FOB: US$ 2.50/dmtu for Lump ore and US$ 2.38/dmtu for Sinter Feed ore (dmtu=dry metallic unit)
Specification:
1. Lump Ore
1.1 Size: From 6.35 mm to 76.2 mm (20.0% max < 6.35 mm and 5.0% max > 76.2 mm)
1.2 Chemical composition (Lump)
Item Expected (%) Guaranteed (%)
Mn 45.8 44.0 min
Fe 3.2 4.0 max
Al203 7.6 8.5 max
SiO2 4.7 5.5 max
P 0.05 0.08 max
S 0.005 0.009 max
BaO 2.0 3.0 max
Moisture 10.0
2. Sinter-Feed
2.1 Size: From 200 mesh to 6.35mm (15.0% max < 200 mesh and 10.0% max > 6.35mm)
2.2 Chemical composition (Sinter Feed)
Item Expected (%) Guaranteed (%)
Mn 45.3 43.0 min
Fe 3.3 4.0 max
Al203 7.4 8.5 max
SiO2 4.6 5.5 max
P 0.05 0.08 max
S 0.005 0.009 max
BaO 2.6 3.2 max
Moisture 12.0